Here's the sew along time line:
Cut out pieces 15 - 21 Feb (1 week)
Preparing the binding, button loop, self cover button and interfacing (steps 1-4 on the instruction page) 22 - 28 Feb (1 week)
Bag exterior and lining (steps 5-8 on the instruction page) 1 - 7 March (1 week)
Binding - top edge, side top edge and handles (steps 9 - 14 on the instruction page) 8 - 14 March (1 week)
Let's see the fabric I had in mind
This[A]
OR
this [B]
Hmmmm,yang mana satu ya,truly,mak teh sememangnya tak pandai nak mismatch fabric ni,kainnye biasa aje.
O h ya paten dah siap diprint dari SINI .Sekarang hanya perlu memotong.So off me go and cut cut away....